Smart home pre-wire checklist for new construction in Southwest Florida
Building or remodeling? The cheapest time to add a smart home is before the drywall goes up. Here is what to plan for during framing so nothing has to be patched in later.

What to wire before drywall
Start with the equipment location. Every system needs a home: a closet or rack location with power, ventilation and a path to every room. Plan it early so it is not squeezed into a pantry at the end.
Wi-Fi access points. Florida homes with block walls, metal roofs and big lanais need wired access points in the ceiling, including coverage for the pool, lanai and dock.
Speakers and TVs. Mark in-ceiling and in-wall speaker locations and every TV location, including outdoor TVs, with the wire run from each one back to the rack.
Lighting control and keypads. If you want Lutron lighting control, decide keypad locations by each entry and bedside before the electrician roughs in.
Motorized shades. Shades need power or low-voltage wire at each window head, and pockets planned with the builder if you want them hidden.
Cameras, door stations and security. Plan camera locations around entries, driveway and dock, plus wiring for the alarm panel, door contacts and a video doorbell or door station.
Write it down. We give builders numbered device plans and wire schedules so every trade knows what goes where.
Talk it through with our team
Call or text (941) 263-4476, or book a visit to our Certified Control4 Showroom at 4318 N Access Rd, Englewood. PC Systems has designed, installed and supported smart homes across Southwest Florida since 2006.
Common questions
When should a smart home be pre-wired?
During framing, after the electrician roughs in and before insulation and drywall. That is when wire can go anywhere without patching.
Do you work directly with builders?
Yes. PC Systems works with builders, architects and designers across Southwest Florida from plan review and pre-wire through trim-out and programming.